General comment Dataset developed within the ARCADIA project in the context of the Ph.D. of Federica Carollo (Politecnico di Milano).
The dataset refers to the selective demolition of 1 m3 of a commercial building with a total volume (empty to full) of 500.000 m3.
The dataset is composed of 20-unit processes:
Input:
1) Diesel consumption for the machinery used;
2) Electricity consumption for the machinery used;
3) Water consumption for the machinery used;
4) Big bags production for the storage of waste mineral wool (Process: Insulating materials, storage);
5) Transport: Mixed C&D to Landfill;
6) Transport: Iron and Steel to Recycling;
7) Transport: Aluminium to Recycling;
8) Transport: Cables to Recycling;
9) Transport: Gypsum to Recycling;
10) Transport: Wood to Recycling;
11) Transport: Insulating materials to a storage plant;
12) Transport: Insulating materials from the storage plant to landfill;
Output:
13) On-site reuse of EWC 17 09 04 - mixed C&D waste (transport = 0) (Process: Mixed C&D waste, on-site reuse);
14) Landfill of EWC 17 09 04 - Mixed C&D waste (Process: Mixed C&D waste, landfill);
15) Landfill of EWC 17 06 04 – Insulating materials;
16) Recycling of EWC 17 02 01 – Wood (Process: Wood, recycling);
17) Recycling of EWC 17 08 02 – Gypsum based construction materials (Process: Gypsum waste recycling, for sludge production);
18) Recycling of EWC 17 04 05 – Iron and Steel (Process: Iron and Steel, recycling);
19) Recycling of EWC 17 04 02 – Aluminium (Process: Aluminium, recycling);
20) Recycling of EWC 17 04 11 - Cables (Process: Cables, recycling). |